Earl and the Aboveground Storage Tank Forum for fuel tanks, plastic tanks, fuel oil storage tanksWelcome to the aboveground storage tank forum, a bulletin board dedicated to tanks, fuel tanks, plastic tanks, fuel storage tanks, and above ground storage tanks (AST) API650, API653 & UL142 aboveground storage tanks (AST) and chemical plastic tanks. Remember the forum is made up of volunteers from experts to beginners. Unfortunately, we cannot allow free commercialism that promotes products, services, or sites.
 
Sponsored by:

Contact us about advertising

Tank sketch plate replacement

From: Stephen Crane [977] 0 Stars
Date: Wednesday, April 20, 2011
Time: 7:40:03 AM
Remote Name: 65.246.25.90

Comments

If we do a floor repair that includes the replacement of sketches, are we obligated/required to fix all nozzles that are not in code? I have thought that once you breach the corner joint which triggers a hydro, you should satisfy all code requirements. On this particular riveted tank, there are already three floors installed over the last 60 years. No nozzles have been changed, and the original manway rivited pad has been cut through twice.

Silver Star Sponsors
    Tutorial on Pressure Vessel Safety Awareness        AIS Forensic Testing Laboratory Steel Making Tutorial Industrial Training School | Little Smokey's Bookstore at AIS Engineering Books | ASR Search Engine | Steam and Power Forum
Want to Advertise on the AST Forum
Confidentiality, Disclaimer & Policy
Copyright 2001-2012
All Rights Reserved; AST-FORUM.COM
Valid XHTML 1.0 Transitional